Tuesday, 25 March 2014

production schedule location visit


Production Schedule
Location Visit Sheet

Programme Title:
Client:
Writer:
Producer:
Director:
Date:

Rough Sketch/Explanation of location and key points to note
 The location that i am going to be using is victoria park. This is because it will be sunny when i am going to be filming and i will also be able to get nice shots of the senery of the park. The location is close to where i am living along with where the person in my video is living leaving. The second location will be a house win well street as the garden is nice as well as being convenet to get from victoria park to the house.
My third location will be a courtyard in a housing estate in shoreditch. This location is very nice as they have built a little garden with loads of different flowers growing which would be very good for the shots that i will be taking.
Also my Dad lives there and he has his Old Lambretta parked out side which would look good in the video. It also helps by being able to use my dads house.   
Access to location via:
All locations are very easy to get to from where i live as they are all about 10-15 minuets away from each other.

Name and number of location contact:



 Health and Safety Issues to note:

      when using the scooter we should make sure that it is safe to sit on as if it falls over whilst someone is sitting on it then that can be dangerous. 
Potential Filming Problems :

  •         problem that i could face when filming is the weather. I want the shots to be in the sun. If it is a cloudy day then i would have to film inside. 
Victoria park also has a lot of people that go there when i get sunny therefore we would have to find quite parts of the park to make sure that we don't disturb other people using the park. 

Additional Notes:  (map of area/weather forecast etc)




















Wednesday, 5 March 2014

assignment 2-Task 5 Pre production



Proposal
Prepared by
Jacob L Lajolie  
 Proposal: I am making a music video for the band Jaws. The song that i m going be using for the video would be on the the song Stay in.  I have had a few ideas on what i could base the whold emusic video and the main one that i had was filming at night when there are not a lot of people around. For example i would go around the back of old street because the streets are really nice there but i would go at about 4\5 o'clock in the morning so that there would barely be any one around the streets. Also i would want to go bethnal green because i know where there are some archers are which would also make the video olook better. When i film that scene would wait until it was very early morning because hopefully the sun wont be up but there would be some light. Also would like to get some different shots of people sitting around a table in a pub/bar.  


Costumes and Props

Character Name: Jake Tappin 

Costume: 
blue demin jeans 
black puffy jacket with a shirt
A hat of some sort 
Props:
a table

Character Name: james turner  

Costume: 
bomber jacket
black jeans
green t shirt with a big colourfulish jumper 
Props:

Character Name: charlotte cunnell

Costume:
red skirt 
white and black stripy top
black vans and

Props:


Production Budget


Item
Cost
 Camera. Cannon 
                                              

                     


 £300 






Total Production Budget:





Production Schedule
Call Sheet

Programme Title: 
Client:
Writer:
Date:
CREW

Camera: Jacob Lajolie 

Production Assistant: Jacob Lajolie

Sound: Jacob Lajolie 

Props: Charlotte Cunnell 

Others:

Meeting at: shoreditchh church 

Location Venue: The misty moon, bethnal green 

CALL DATE: 14th april 

CALL TIME: 4.00 am 

Transport: Get the Bus to different locations 

INSTRUCTIONS:


Actors: Charlotte Cunnell, Jake Tappin, James Tunner 

Make – up: Charlotte Cunnell 

Wardrobe: Jacob Lajolie 

Location Catering: Non 

Notes:




Contingency Plan
Name: Jaocb Lajolie

Production: 

Potential problems and how to overcome these problems: 




                     




Storyboard